Major Projects
2018 – USNS Invincible
– Pressure control with 2x 55KW VFD’s for Radar Process Cooling Equipment. VFD, PLC and HMI integration, development, programming, installation and commissioning.
– Installation and commissioning for 2x 55KW VFD’s for Engine Room Fans.
2018 – USNS Howard O. Lorenzen
Temperature and flow control with 4x 150KW VFD’s for Radar Process Cooling Equipment. VFD, PLC and HMI integration, development, programming, installation and commissioning.
2017 – USNS Howard O. Lorenzen
Development, installation and commissioning for an Intrusion Detection System.
2015 – M/V Cragside
Commissioning, installation, service, engineering and management for all switchboards, power distribution panels, and added / modified electrical systems during the major conversion.
2012 – M/T American Phoenix
Commissioning, installation and service for 2x 4.65MW electrical propulsion systems.
2011 – USNS Howard O. Lorenzen
Commissioning, installation and service for 2x 7.5MW electrical propulsion systems, 1x 2.12MW Directional Thruster, 1.12MW Bow Thruster.